Issue 2
Apr.  2014
Turn off MathJax
Article Contents
QIN Xianguo, MA Hongkui. Grey Model-based Railway Bridge Crack Deterioration Prediction[J]. Journal of Transport Information and Safety, 2014, (2): 127-129,134. doi: 10.3963/j.issn.1674-4861.2014.02.025
Citation: QIN Xianguo, MA Hongkui. Grey Model-based Railway Bridge Crack Deterioration Prediction[J]. Journal of Transport Information and Safety, 2014, (2): 127-129,134. doi: 10.3963/j.issn.1674-4861.2014.02.025

Grey Model-based Railway Bridge Crack Deterioration Prediction

doi: 10.3963/j.issn.1674-4861.2014.02.025
  • Publish Date: 2014-04-28
  • The concrete cracks on railway bridges are common problems ,which have serious impact on the service life of the railway bridge .A non-equal interval GM (1 ,1) prediction model based on grey system theory is proposed to pre-dict the crack width of the railway concrete bridge .According to the predicted deterioration of bridge conditions ,the ma-intenance plan of BICS can be developed to improve the bridge conditions and train safety .The prediction model was vali-dated by using the crack data of Beiniuchuan Super-large Bridge of Shenshuo Railway from 1996 to 2012 .The results show that the prediction model can accurately predict the crack width of the bridge .The paper also analyzes the effect of BICS injection method applied in Beiniuchuan Super-large Bridge of Shenshuo Railway .Its repair effect on the concrete crack is significant .

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (252) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return